Alliant Energy has informed us that they will be cutting off electrical power to the District Services Office today, Monday, August 3, at 5:30 PM. The outage will last approximately ninety minutes.
We do not anticipate any disruption of technology services to other buildings, thanks to our emergency generator.
Showing posts with label power outage. Show all posts
Showing posts with label power outage. Show all posts
Monday, August 3, 2009
Thursday, July 24, 2008
Power restored
Power has been restored to Oregon. Our systems are operating normally.
There are still unrelated outages on the east side of Madison and in eastern Dane County. Reports are that some US Cellular towers went offline around 3 am, and Verizon land lines are affected, as well as some Norlight circuits. This has resulted in Internet access outages for people around the Dane County area.
There are still unrelated outages on the east side of Madison and in eastern Dane County. Reports are that some US Cellular towers went offline around 3 am, and Verizon land lines are affected, as well as some Norlight circuits. This has resulted in Internet access outages for people around the Dane County area.
Power outage since 6...
Power outage since 6 o'clock PM. Oregon is experiencing a wide spread power outage affecting most, if not all of town. Our core systems are running on the generator.
Thursday, February 7, 2008
Power Outage Debrief
The DSO experienced a power outage from 10:59 AM - 11:17 AM today, Wednesday, February 7. Because our IT infrastructure is centralized in the DSO, this could have been quite a problem. Fortunately, we designed our new datacenter with some elements to keep us up and running during such an outage.
Here's a debriefing of the incident.
At 10:59 AM, power was lost at the DSO, NKE, and PVE (and possibly others as well). OMS reported a brief flicker.
When the power went out, the UPS units kept all servers, core switches, routers, transceivers, and PBX equipment running until the emergency generator turned on and supplied power. The generator was supplying power within one minute. The datacenter load transferred to the generator power source seamlessly. All VoIP phones in the DSO stayed operational because they use power over ethernet (POE) from the 3750 switch.
Jon opened the datacenter door with a key because the strike plates did not open when card was swiped. This was fixed a few minutes after the generator power came online. Control Solutions will add UPS backups to their systems soon to insure that card access keeps working in an outage.
Desktop computers in the DSO all turned off (except Zach's because he put his on a UPS). Those in the tech area turned back on when the generator power kicked back in.
The WAN connection to OMS stayed up (Kiwi Syslog provides notification of dropped links), which is better than the previous two power "blips" that have caused the switches at OMS to reboot, thus interrupting the network connections for the entire school.
The only WAN connections that went down unexpectedly were the switches at PVE. They should have lasted longer. This was not a crucial issue, since they do not use VoIP phones, and all the computers were down anyway. Upon investigation, the UPS powering those switches was too small and old. Zach replaced it with the one from his desk.
When designing the tech area, we decided to include all the electrical outlets on the generator-supplied circuits so that the tech offices can be used as an emergency headquarters. This was the first extended blackout since then, so I informed other DSO staff that if they had urgent work to do, they could use a desktop computer in our area.
The idea is that district administrators could bring their laptop computers and phones to the tech area and set up a temporary command center. Our wireless access points use POE to remain active during a blackout, and laptops run on battery power for a while, so they can stay running and connected for quite a while.
Power came back online at 11:17. Generator turned off at 11:27. Desktop computers in the tech area stayed up during the cutover back to regular power.
In the old scenario without an emergency generator, all district phones would have gone dead around 11:05. All server connections would have been lost around 11:10.
I'm very happy with how everything worked out, especially considering how bad this would have been without the emergency generator.